Mistake 1: Designing Around the Appliances You Have, Not the Kitchen You Want
Keeping old appliances to save money is fine — designing the entire new kitchen around a 15-year-old fridge's odd dimensions is not. Appliances get replaced; the cabinet layout lasts decades. If an appliance is near the end of its life, plan the kitchen for its standard-size replacement, not its current quirks.
Mistake 2: Too Little Counter Next to the Range and Sink
Every cook needs landing space: counter immediately beside the range for hot pans, and on both sides of the sink for prep and dirty dishes. Kitchens designed for looks often starve these spots. When we lay out a kitchen, the landing zones are non-negotiable — at least 12 inches by the range, 18 or more by the sink.
Mistake 3: One Light for the Whole Room
The single ceiling fixture is the most common lighting mistake, and it ruins an otherwise beautiful kitchen. Counters need under-cabinet task lighting, the room needs ambient fill, and the island needs pendants. Lighting is also the cheapest phase to get right and the most expensive to fix later — wire it during rough-in.
Mistake 4: Ignoring the Trash
Nobody designs for the trash cans, so they end up in the corner, ugly and in the way. A pull-out trash and recycling cabinet near the prep zone costs little and gets used fifty times a day. Plan it in the design phase, not as an afterthought.
Mistake 5: Choosing Finishes in the Store's Light
Showroom lighting lies. That quartz sample looks different under your kitchen's LEDs at 7 p.m. than under the store's fluorescents at noon. Always take large samples home and look at them in your kitchen, at different times of day, next to your cabinets and floors. We bring full-size samples to every estimate for exactly this reason.
Mistake 6: No Contingency for Surprises
Old kitchens hide water damage, bad wiring, and structural quirks. Homeowners who budget to the last dollar panic when demo reveals a problem; homeowners with a contingency handle it calmly. A good contractor investigates before quoting to shrink the unknowns — but no one can see through walls, so plan for it.
Mistake 7: Changing the Design Mid-Build
Moving the sink after the plumbing is roughed in, swapping the tile after it is ordered — change orders are the fastest way to blow a budget and a schedule. Finalize the design before demolition. Live with the plan for a week. Then commit.